Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 25, 2023

September 27, 2023

February 6, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$650,000.00

Public - City

img_map_placeholder

Multiple Locations, Contrecoeur, QC

Subscribe to View Full Documents

Background: The work is located in the Contrecoeur sector and involves infrastructure owned by ArcelorMittal Long Products Canada ("AMPLC") and Canadian National ("CN") in Contrecoeur, Quebec. The work is divided into five (5) components. The work includes, but is not limited to, the following activities: Component 1: Grade Crossing #1 (PM 29.34) Reconstruction and widening of the railway road; Construction of three (3) grade crossings; Supply and installation of railway signalling; Dismantling of existing crossings including their signals Electrical work; Component 2: Relocation of a railway line in Feruni Reconstruction of the railway; Dismantling of the existing track; Component 3-1: Redevelopment of access road #1 (Feruni Parking) Construction of a roller-compacted concrete (RCC) road; Supply and installation of an HDPE culvert; Electrical work; Component 3-2: Redevelopment of Access Road #2 (West Complex) Construction of a path in granular materials; Supply and installation of an HDPE culvert; Electrical work; Component 4: Grade Crossing #2 (PM 29.69) Construction of the road crossing the railway tracks; Construction of two (2) grade crossings; Supply and installation of railway signalling; Supply and installation of HDPE culverts; Electrical work; Component 5-1: Pavement Rehabilitation #1 (between Feruni and the reduction plant) Reconstruction of a roller-compacted concrete (BCR) road; Electrical work; Component 5-2: Roadway Rehabilitation #2 (south of Crossing #1) Reconstruction of an asphalt road; Construction of two (2) grade crossings; Supply and installation of level crossing signalling; Electrical work. Question Acceptance Deadline: 2023-07-05 10h00 Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects