Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 10, 2023

August 9, 2023

September 2, 2024

106 W Vaughan Rd

Renovation

No Information to Display

No Information to Display

Public - County

img_map_placeholder

106 W Vaughan Rd, Ashland, VA

Subscribe to View Full Documents

DESCRIPTION OF WORK: The project is generally described as: Provide all labor, materials, tools, equipment, services, transportation, and incidentals necessary for providing and installing the components for the Orbal drives replacement at the Ashland Wastewater Treatment Plant, including associated appurtenances. All work shall be as described in the Project Manual and shown on the Contract Drawings. All work shown on Drawings and/or called for in these Specifications shall be performed under the General Contract, unless specifically noted to the contrary in the Contract Documents. The Project includes, however is not limited to: a. Replacing the mechanical drives for the Orbal Oxidation Ditch b. Replacing the shafts as required for the new mechanical drive replacements c. Removing existing disks from the shafts to be replaced and reinstalling them on the new shafts. d. Replacing miscellaneous components of the Orbal Oxidation Ditch Aeration System including: 1) Couplings 2) Bearings e. Replacing existing two speed drives with variable frequency drives and associated electrical work. f. Replacing and upgrading the HVAC system in the electrical room. Sealed bids for the Ashland Wastewater Treatment Plant (AWWTP) Orbal Drives Replacement project Consideration for withdrawal of bids shall comply with the Code of Virginia 2.2-4330B(1). Provide all labor, materials, tools, equipment, services, transportation, and incidentals necessary for providing and installing the components for the Orbal drives replacement at the Ashland Wastewater Treatment Plant, including associated appurtenances. Quotation No: 447011 R1 All questions about the meaning or intent of the Bid Documents or Contract Documents, even those presented during both meetings shall be submitted in writing to the ENGINEER, Dewberry Engineers Inc., Joshua Hollingsworth: jhollingsworth@dewberry.com. In order to receive consideration, all questions should be received by the ENGINEER prior to 12:00 P.M., JUNE 26, 2023.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.