Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 17, 2023

August 5, 2023

October 2, 2023

321 Third St

Site Work

No Information to Display

$500,000.00

Public - City

img_map_placeholder

321 Third St, Avondale, CO

Subscribe to View Full Documents

Reference Number 0000323980 Job Pueblo County Piggyback Contract No Bid Intent Optional Bid Intent Deadline 07/14/2023 02:00 PM EDT Question Acceptance Deadline 07/14/2023 02:00 PM EDT Questions are submitted online Yes Isolation of existing water main, installation of a 6-foot diameter manhole, meter, valves, piping, backfill, seeding and other appurtenances associated with the meter installation Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Contact Information Kenneth Young 7195682074 Ken@jesik.us The proposed Meter Installation Work consists of the following: Isolation of the existing water main, installation of a 6-foot diameter manhole, meter, gate valves and pipelineappurtenances, and all other work related to the Meter Installation.

31 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.