Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
July 6, 2023
August 7, 2023
No Information to Display
717 N Grand Ave
Site Work
No Information to Display
No Information to Display
Public - State/Provincial
717 N Grand Ave, Tahlequah, OK
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Work Summaries The following Contract (Bid Group) Work Summaries describe the intended scope of work to be included in the Bid Package. The bid shall include all the requirements of the plans with specifications unless specifically indicated otherwise in this summary. This includes all layout and daily clean up involved with the work. It is the bidders responsibility to review bidding requirements and forms to insure a complete, safe, and coordinated execution of the Work Package being quoted. Additionally, bidders shall include in their pricing applicable portions of related specification sections normally associated with the work to be done whether specifically indicated by this Contract Work Summary or not. Should any bidder be unclear as to the scope of work required, he is instructed to contact the Owner for resolution prior to bidding. In the absence of written instruction to the contrary, in matters of specification and/or scope of interpretation, bidders shall include the more costly and complete of the possible interpretations. Awarding of Contracts will be based on best qualified bid. CONTRACT: General Construction Work including but not limited to the following: 1) Drawings and Specifications as identified in Contract Attachment B Including But Not Limited To: 1) Demolition and removal of existing air handler from campus 2) Demolition should include all water piping, electrical, control wiring, and ductwork that is in the way of unit removal 3) Bidder responsible for repairing damages caused by bidder. 4) Bidder is responsible for getting new, owner provided, unit inside of the building. 5) Installation of new owner provided unit 6) Re-pipe chilled and heating water to new unit 7) Insulate all new piping 8) Reconnection/Build-Out of existing trunk duct lines to new unit 9) Reconnection/Build-Out of return air duct to the new unit 10) Reconnection of power from VFD to new unit 11) Reconnection of Control wiring 12) Reconnection of condensation piping 13) Bidder is responsible for start-up of new unit 14) Bidder should check operation of new unit as part of job completion 15) NSU is a Tobacco Free campus; Contractor will be expected to abide by NSU policy and will be held accountable for all Subcontractors on site. 16) Contractor shall be responsible for coordination of all necessary local, state and federal, pre, during and post compliance inspections. Contractor shall provide NSU with documentation of compliance at completion of work. 17) Contractor to be responsible for all permits and fees associated with this scope of work. 18) Work may be halted and resumed at any given time according to NSUs needs. 19) Contractor shall be responsible for mobilization and staging locations to minimize daily operations of the university. 20) Utility terminations shall be in accordance with the governing utility procedures and regulations. NSU will be given a minimum of 24 hours notice prior to any utility outages/shut-offs. 21) Contractor shall be responsible for coordinating any and all utility locations for the project. 22) Contractor is responsible for furnishing, receiving, protecting and installing specified materials per the construction documents. 23) Contractor is responsible for all field verifications of dimensions and conditions. 24) NSU will provide information on electrical panel locations and available power from each location. 25) Contractor is to ensure that construction trash and demolished debris is gathered and disposed of daily in contractor provided trash receptacle. 26) Contractor is responsible for daily clean-up and equipment storage. NSU is not responsible for damaged or stolen property and/or equipment. 27) Contractor shall be responsible for abiding OSHA and NSU safety regulations. 28) Contractor shall be responsible for protection of existing equipment and materials that are not called out to be demolished or repaired. 29) Any discrepancy between the plans/specifications and actual field conditions must be submitted in writing to the owner a minimum of 72 hours prior to the bid closing date. 30) Contractor shall be responsible for demolition, removal, loading and haul off of all materials, scraps and debris. 31) Contractor shall be responsible for repairing rutted or furrowed greenspace, by means of fill dirt and sod, as deemed necessary by the owner. 32) Contractor shall be responsible for any broken or crushed concrete sidewalks, curbs, decks, walls or other cementitious materials. 33) Contractor shall not interfere with building exits or egress paths of any occupied buildings. 34) Contractor shall maintain a site supervisor at all times when the contractor has a presence on campus. 35) Contractor shall be responsible for Final Cleaning. This will be to the Owners discretion. 36) Contractor shall be responsible for and acknowledge all plans, specifications, and details as shown in all bidding documents.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Tahlequah, OK
Bid Date: Aug 17 2023
Tahlequah, OK
Bid Date: Aug 02 2023
Tahlequah, OK
Bid Date: Aug 24 2023
Tahlequah, OK
--
Tahlequah, OK
Bid Date: Aug 02 2023
Tahlequah, OK
Bid Date: Jul 11 2023
Tahlequah, OK
Bid Date: Jul 31 2023
Tahlequah, OK
Bid Date: Jul 31 2023
Shawnee, OK
Bid Date: Jun 20 2023
Owasso, OK
Bid Date: Aug 15 2023
Pryor, OK
Bid Date: Aug 15 2023
Muskogee, OK
Bid Date: Aug 04 2023
Hulbert, OK
Bid Date: Aug 04 2023
Wagoner, OK
Bid Date: Aug 04 2023
Enid, OK
Bid Date: Aug 11 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
