Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 29, 2023

September 25, 2023

No Information to Display

64 Hart St

New Construction, Paving, Site Work

No Information to Display

$4,500,000.00

Public - State/Provincial

img_map_placeholder

64 Hart St, New Britain, CT

Subscribe to View Full Documents

As of August 16, 2023, this project has not yet been awarded. The architect is in the process of adjusting the drawings for Department of Housing review. A timeline for award has not yet been established. Project scope includes but is not limited to site work and construction of two 3-story wood-framed multi-family buildings with concrete footings, foundation walls and concrete slab on grade. 16 Units. Selective site demolition, concrete, masonry, metals, wood trusses, rough and finish carpentry labor & material, insulation, asphalt shingles, doors, frames and hardware, vinyl windows, gypsum board, flooring, painting, toilet & bath accessories, signage, postal specialties, residential appliances, window shades, casework & countertops, fire suppression, plumbing, HVAC, electrical, earthwork, final cleaning and sanitary facilities. The site was occupied by a series of medical office buildings. A majority of the buildings have been demolished to provide for Wheeler Health Care. The portion of one building remains and is to be demolished as part of this project, along with associated bituminous concrete parking areas and concrete sidewalks, utilities, etc. Project is Tax Exempt. No wage rate project.

25 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects