Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

April 4, 2025

No Information to Display

Multiple Locations

Renovation

No Information to Display

$250,000.00

Public - City

img_map_placeholder

Multiple Locations, Livingston, MT

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The 1 MG tank provides water to approximately 70% of Livingston currently. The City does not have the ability to isolate this tank in the event of failure or necessary repair. In 2016, Stahly Engineering & Associates provided a technical document to detail necessary upgrades to the water system that would enable the 1 MG tank to be offline for more than a day. The City has already taken steps toward this improvement by installing the tank connection PRV. The remaining improvements required for the tank isolation include: 1. Install a tank isolation valve on the 24-inch transmission main to the 1 MG tank 2. Install a drain on the 24-inch transmission main to the 1 MG tank upstream of the isolation valve 3. Install a surge tank with capacity for the active surge volume for the maximum flow rates in and out of the 1 MG tank for a given duration This project is included on the city's fy 2023-2026 Capital Improvement Program. As of October 12, 2023, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.