Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 13, 2023

June 16, 2025

No Information to Display

Multiple Locations

Addition, Demolition, Renovation, Site Work

No Information to Display

$400,800,000.00

Public - County

img_map_placeholder

Multiple Locations, Lansdale, PA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

As of September 20, 2024, design is underway. Bidding is expected April to June 2025. _____________________ The North Penn School District is soliciting proposals from Construction Management (CM) firms to provide owner's representation, pre-referendum, pre-construction and construction management services in support of renovations and additions to the North Penn High School. The North Penn School District engaged Schrader Group Architecture to perform a master plan for the North Penn High School. The master plan has concluded, and the final plan includes the two options. Option 1 would include performing a grade realignment to move the 9th grade population (currently housed in the middle schools) to the North Penn High School site. The 9th grade would be housed in an addition to the North Penn High School. In an effort to support the additional student body, other areas of the North Penn High School would be expanded including a new athletic facility and the development of a new commons and cafeteria area. In addition to the additions to the North Penn High School, Option 1 would include all new building systems, increased natural lighting, and 21st century flexible learning spaces. The entire building will be renovated to allow for a reimagined educational facility to meet the needs of 21st century learning The North Penn Board of School Directors has decided to have the public decide if Option 1 will be the preferred option through a referendum process. The portion of the project that will be decided by referendum is the 9th grade addition. If the majority of the public votes "yes" to the referendum, agreeing to build the 9th grade addition, the entire Option 1 project will move forward. If the majority of the public votes "no" to the referendum, Option 2 will move forward. Option 2 is a scaled down project that includes renovating the existing building systems and finishes with a small addition. Option 1 and Option 2 also include relocation of the Transportation Center from the North Penn High School site. This includes the purchase of a property and constructing a new Transportation Center somewhere in the North Penn School District. Information including public presentations, estimates and more specific information regarding the North Penn High School project can be found at the Re-Imagine North Penn High School website. o July 20, 2023* Initial Interviews - ESC, 401 E. Hancock St, Lansdale, PA 19446 o July 26, 2023, Second Round Interviews - ESC, 401 E. Hancock St, Lansdale, PA 19446 o July 31, 2023, Third Round Interviews - ESC, 401 E. Hancock St, Lansdale, PA 19446** o August 8, 2023, Award CM Contract o August 15, 2023, CM Services Begin *Firms will be notified if they were selected for a first round interview on Monday, July 16th. **If needed, third round interviews will be determined after the second round. It is understood that the OWNER reserves the right to reject any or all proposals, or part thereof or items therein, and to waive technicalities required for the best interests of the OWNER. Omission of any information may be sufficient cause for rejection of the proposal. It is further understood that some of the items that will be considered in selecting a firm include but are not limited to: Cost: 30 points K-12 Experience: 25 points Other experience: 5 points Innovative Services: 5 points References: 30 points Creditworthiness: 5 points Note: The selected finalists must submit 3 years of audited financial statements. It is finally understood that by requesting this proposal, the OWNER is not incorporating the public bidding process into this solicitation and nothing contained herein shall create any contractual rights or obligations by and between the OWNER and any person or entity responding hereto Option 1 Construction: Construction Phase 60 Months** Post Construction Phase 6 Months** **Dates contingent upon election date. Option 2 Construction: Construction Phase 48 Months** Post Construction Phase 5 Months** **Dates contingent upon election date. Transportation Center: Design, Bid, & Build October 2023 - September 2025

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.