Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 24, 2023

August 22, 2023

October 23, 2023

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

Multiple Locations, Harkers Island, NC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

PROJECT SCOPE: The National Park Service (NPS) Cape Lookout National Seashore (CALO) is seeking qualified firms or organizations for the installation has a requirement to remove and replace a ferry dock. Contractor will remove the modular floating dock and will be responsible for its disposal. To facilitate the removal, the 70' gangway pilings will be extended to support a cross piece capable of lifting the gangway clear of the floating dock; height should be sufficient to insure it is not struck by the dock or railings at High tide plus 3'. The floating modular dock will be replaced by painted steel barges that will be connected and serve as a 3 floating dock and facilitate the ADA ramp and ferry passenger's egress. All barges will be connected so they float as one unit (see Concept Drawing). The contractor will provide all materials, equipment, personnel, and vessels. OBJECTIVES - GENERAL REQUIREMENTS -Barges should function as a floating dock. -ADA ramp shall be modified to the barges and present a consistent height for ferry boat access. -The 70' aluminum gangway lift will be left in place and painted to match the existing pilings it is built on. -At least 8 dock cleats will be installed, 4 sound side, and 4 shore side. -NPS owned Black poly foam pods and safety equipment will be reinstalled in a configuration that best supports the ferry boat operation. -Clean and dispose of all debris. PERIOD OF PERFORMANCE: . 30 Days Contractor will provide a safety plan to the contracting officer before the start of work any on-site work. A safety plan will include job standards and requirements providing a complete analysis of job procedures and the requirement of the work activity. A Job hazard analysis will be reviewed daily. Include in your safety plan phone numbers and directions to local emergency medical facilities including local emergency medical technicians. All accidents must be reported immediately to the Contracting Officer.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects