Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
August 30, 2023
October 30, 2023
February 2, 2024
Multiple Locations
Site Work
No Information to Display
$1,600,000.00
Public - City
Multiple Locations, Aurora, CO
Reference Number 0000327126 Question Deadline 08/18/2023 at 2:00 PM MT Any questions must be submitted in writing by email to Ted Hartfelder, Project Manager, at thartfel@auroragov.org, and to Nathan Jones, Contract Administrator at njones@auroragov.org. Emailed questions shall contain the project name and number in the email subject line and must be received Questions will be answered via addendum posted to The Rocky Mountain E-Purchasing System aka BidNet. This Project entails the design and subsequent construction of riverbank stabilization measures along an approximately 700-foot reach of the South Platte River at the City of Auroras (Citys) Prairie Waters System North Campus Well Field (Well Field). The Well Field, located on the west bank of the South Platte River approximately midway between Brighton and Fort Lupton, consists of a series of groundwater production wells which indirectly capture water from the South Platte River for the Citys consumptive use. These groundwater production wells are offset approximately 100 to 200 feet from the riverbank. Subsequent to construction, the Well Field periodically has experienced riverbank erosional damage resultant from channel alignment changes due to human and/or natural causes. As the Well Fields infrastructure is near the riverbank, riverbank erosion poses a threat to this infrastructure. This project addresses the most recent riverbank erosion threat to the Well Field. Under this Project the riverbank within the reach will be properly stabilized, and where appropriate the bank edges will be restored (built up) to sufficiently protect the existing Well Field infrastructure. This work will include, but not be limited to, general grading and earthwork; dewatering and erosion control; placement of mixed and buried rock riprap; placement of COIR (or equivalent) blankets; and plantings for wetland, upland, and transition zone vegetation. Bank restoration and placement of riprap will require temporary diversion of the South Platte River and active dewatering at the toe of the reclaimed slope. All Project work will be performed on City-owned property. The estimated cost for this project is from $1,300,000.00 to $1,600,000.00. The Contract Documents require that all work be Substantially Complete by December 29, 2023 with Final Completion by February 2, 2024 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The City shall have the right to reject any and all Bids. A Bid not accompanied by the required Bid Security, other data or documentation required, or a Bid in any other way incomplete, irregular or unqualified, may be subject to rejection.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Aurora, CO
Bid Date: Aug 25 2023
Aurora, CO
Bid Date: Aug 14 2023
Aurora, CO
--
Aurora, CO
Bid Date: Sep 07 2023
Aurora, CO
Bid Date: Nov 15 2023
Aurora, CO
Bid Date: Aug 31 2023
Aurora, CO
Bid Date: Sep 06 2023
Aurora, CO
Bid Date: Sep 20 2021
Aurora, CO
Bid Date: Jul 06 2023
Aurora, CO
Bid Date: Jul 26 2023
Aurora, CO
Bid Date: Jun 09 2023
Aurora, CO
Bid Date: Aug 07 2023
Aurora, CO
Bid Date: Aug 25 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
