Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 13, 2023

April 19, 2024

No Information to Display

San Simeon Dr & Carmel Dr

Site Work

No Information to Display

$4,929,632.00

Public - City

img_map_placeholder

San Simeon Dr & Carmel Dr, Lemoore, CA

Subscribe to View Full Documents

**As of October 20, 2023, bids received were rejected. Project will rebid but no definite date yet.** Question Deadline 07/04/2023 All questions regarding this project during the bidding phase shall be submitted in writing to Stephanie Hermeston, at Stephanie.Hermeston@qkinc.com. Questions are due no later than 7-days prior to bid opening. The Work to be performed under this Contract as described below shall consist of furnishing all materials, equipment, supplies, labor and transportation, and performing all Work as required by and in strict accordance with the Contract Documents, all of which are made a part hereof. The Work shall be complete, including all Work, material, and services not expressly called for or shown in said Contract Documents, which may be necessary for completion and proper construction to carry out the Contract in good faith. The site of Work shall be left in a neat condition. The cost of all Work performed, furnished, and installed is to be included in the amount bid for the various items of Work with no separate compensation allowed therefore. All Work shall be performed in accordance with the applicable portions of the latest revisions of the City Standard Specifications and Standard Drawings; and any other plans or specifications indicated in the Contract Documents. The scope of Work is outlined in the Contract Documents, including but not limited to the Plans and Contract Specifications. furnishing all labor, materials, services and equipment, and performing all work necessary as specified for, but not limited to, installation of new sanitary sewer trunklines, installation of a new lift station and associated improvements including furnishing and installation of new wet well, new pumps, level sensor, control panel and associated electrical improvements, as the Lemoore Sanitary Sewer Lift Station 9.

33 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.