Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 31, 2023

November 30, 2023

No Information to Display

1 Harpst St

New Construction, Renovation, Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

1 Harpst St, Arcata, CA

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The Project consists of: The project as currently envisioned has two distinct elements: Element 1: Design and renovation of Jenkins Hall to accommodate the academic functions currently located in the existing Ceramics and Sculpture Labs. The removal of these facilities is necessary to construct Element 2. Jenkins H all is on the City of Arcata's historic landmark listing (though not registered) and is currently unoccupied. Element 2: Design and construction of the Health, Dining and Housing Building Project as described more fully below: The vision is to develop a building that coalesces an ecosystem of programs and functions that will enrich the student experience and bolster persistence goals. The hybrid building (approximately 200,000 GSF) will create a welcoming hub for student life and resources that center justice, equity, belonging, holistic sustainability, and healthy living. Major program areas include: A new student health center (approximately 35,000 GSF) that will provide medical health services, counseling and psychological services and health education. A new hub for campus dining services including a cafe/bakery, (approximately 35,000 GSF) that supports holistic wellness, dignified, diverse food access to address basic needs including a food pantry program and demo kitchen connected to student health education. A 518-bed residence hall that centers belonging and community - includes a mix of units (doubles and singles) with social amenities and services that cultivate learning communities. The project site for Element 2 is situated near the current location of the existing Ceramics and Sculpture Labs, and Parking Lots R8 and G11 (northern portion). The project boundaries are approximately: Lot G11 as the southern extent, LK Wood Boulevard as the western boundary, Rossow Street as the eastern boundary and the northern boundary is the existing Campus Apartments and the rising hillside. As noted, there are existing buildings on the site that will require demolition. LICENSE REQUIREMENTS B License Last day to submit RFP questions 22 August 2023 Last day to submit RFQ questions.

89 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.