Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 4, 2023

May 1, 2024

July 31, 2024

64 Dundas Ln

Renovation

No Information to Display

$9,400,000.00

Public - State/Provincial

img_map_placeholder

64 Dundas Ln, Guelph, ON

Subscribe to View Full Documents

The University of Guelph is pleased to issue this Request for Proposal for Construction Management Services related to the East Residence Exterior Rehabilitation, Phase 2 project located at the Guelph campus. The University has retained a Consultant for the design and contract administration of this work. Currently, the Consultant has completed approximately 95% of the construction documentation stage. The University intends to onboard a Construction Manager at this time to take advantage of their constructability knowledge and experience to assist with document completion, project planning, cost control, and construction execution. Together with its consultants, the University believes that the full extent of the proposed work is achievable within budget and schedule parameters outlined by the University. The Project has been designed and documented. The design may need to be revised/phased to suit the project's limited construction schedule. The scope of work includes exterior rehabilitation of the 1-storey Pedestrian Mall and the 12-storey Glengarry Hall. Phase 1 is currently in progress and scheduled to be completed in August 2023, it includes the exterior rehabilitation of the 4-storey Lanark and Dundas Halls. The intent is to modernize the current cladding, windows, exterior doors, frames, and exterior lighting in order to provide students with updated facilities. This construction project must be completed between May 1, 2024 and July 31, 2024 while the residence is unoccupied during the summer semester. If it is determined that the project cannot be completed within this timeline, the CM will recommend dividing the project into two phases, each occurring over the course of two summers between May 1 and July 31 in 2024 and 2025. The CM will also suggest different options for improving overall constructability and reducing costs, project timeline, and disruption to surrounding occupied East Village Townhouses. Based on currently approved funding, the Project has a construction budget of $9,400,000.00, excluding value added taxes. Direct all inquiries in writing, by e-mail, to Ena Jhajj ejhajj@uoguelph.ca before 3:00 PM on Monday, June 26, 2023. Documents can be obtained at: https://uoguelph.bonfirehub.ca/opportunities/67622

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.