Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 26, 2023

July 26, 2023

November 15, 2023

1043 Kittson Rd

Paving, Site Work

No Information to Display

$5,370,942.00

Public - County

img_map_placeholder

1043 Kittson Rd, East Selkirk, MB

Subscribe to View Full Documents

Work of this Contract comprises of the remediation the Rural Municipality of St. Clements - MEMO Sites #9, #11, #12, #41, and #42. The overall work will consist of the following for each site: Site #9 consists of remediation of slope movements along the northern road embankment and ditch side slopes of Road 89N between Roads 45E and 46E. This work consists of a combination of rockfill shear keys, granular ribs, and a geogrid embankment reconstruction. The total length of Site #9 is 1.6 km. Site #11 consists of remediation of slope movements along the southern road embankment side slope of Ashfield Road between Floodway Drive and Kirkness Road. This work consists of the installation of a rockfill shear key and granular ribs. The total length of Site #11 is 300 m. Site #12 consists of remediation of slope movements along the southern road embankment side slope of Ludwick Road between Henderson Highway and Rebeck Road. This work consists of the installation of granular ribs. The total length of Site #12 is 55 m. Site #41 consists of the remediation of erosional damage and slope movements within the ditch immediately west of Old Henderson Highway, south of the town of East Selkirk. This work consists of slope regrading and placement of rockfill riprap material. The total length of Site #41 is 25 m. Site #42 consists of a large slope failure along the western side slope of the southern approach embankment of the Old Henderson Highway bridge over Cook's Creek. This work consists of a combination of a steel sheet pile wall along the northern portion of the slope failure and a granular fill toe berm installed along the southern portion of the slope failure. The total length of Site #42 is 35 m. Deadline for receipt of questions : 2023-06-20 14:00:00 CDT Contact Information Stantec Consulting 204-928-8827 justin.saj@stantec.com Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects