Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 9, 2024

November 1, 2024

June 30, 2027

10192 Hwy 50

New Construction

No Information to Display

$220,000,000.00

Public - City

img_map_placeholder

10192 Hwy 50, Brampton, ON

175

8

88

31

Subscribe to View Full Documents

The Construction Management Services contract will be executed in a Phased approach: Phase 1 for the design in which a Pre-Construction Services Agreement will be executed. Phase 2 for the potential early works and site development, and Phase 3 for the tendering, construction and post-construction, executing a CCDC 5B and the City's Supplementary Conditions. NOTE: Phase 2 is contingent on Steering Committee approval and Phase 3 is dependent on budget and Council approval. The Construction Manager shall have the ability, experience, equipment and financial stability to perform all construction tasks from initial consultation and design input, mobilization, construction, project handover and warranty periods. The City has received an estimated construction cost of $220-million (not including Cash Allowance or Contingencies) excluding HST for the construction of the new Transit facility, which includes General Expenses and Construction Manager's fee. The City of Brampton (the City) requires services from a construction management company (the Construction Manager) for the construction of the new Transit facility (the Facility), to be located near 10192 Highway 50 (Highway 50 and Cadetta Road), Brampton, ON. The City is seeking detailed Proposals from Construction Management companies interested in providing construction management services, including pre-construction and implementation of construction services, for the development of the new Transit facility in three development phases. The Facility is anticipated to be approximately 500,000 sq ft and will include an indoor garage to park 250 40' Standard Bus Equivalents (SBE); a service and maintenance garage; and administrative support spaces. This Project is phase 1 of a multi-phased development; subsequent phases include future expansion to full capacity following the re-alignment of Rainbow Creek and the floodplain, and future full fleet electrification. Documents can be obtained at: https://brampton.bidsandtenders.ca TIMELINE: RFP for Construction Managers has closed; firm has yet to be selected. Substantial Performance is tentatively set for Q4 2026 with a Total Completion in Q2 2027.

56 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects