Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 30, 2023

July 7, 2023

November 30, 2023

285 St George St

Renovation

No Information to Display

$500,000.00

Public - City

img_map_placeholder

285 St George St, Granville Ferry, NS

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Town of Annapolis Royal is undertaking the installation of a net-metered photovoltaic system to offset the energy requirements to operate the ultraviolet (UV) sterilization system at their sewage treatment plant in Annapolis Royal, Nova Scotia. This undertaking will coincide with additional maintenance and development at the site including the installation of a backup generator for the UV system, land forming, and the installation of an additional settling pond on the property. All work will take place over the course of the Summer and Fall of 2023. The worksite will be encompassed within the parcel of land with the PID 05001862, see attached map. The Town of Annapolis Royal is seeking to contract services for the installation of an appropriate solar array capable of meeting the energy requirement to operate the UV sterilization unit including system design, permitting, liaising with NSP as necessary, installation, final inspection, and connection. Project management will be provided by the Town of Annapolis Royal, including the hiring and management of additional contractors to provide services necessary for the successful completion of this project (e.g. land clearing, land forming, electrician services). Estimated Duration of Contract (months) - 4 Full design proposal to be completed by July 13, 2023 Design to be reviewed by the Town of Annapolis Royal and feedback provided to proponent by July 20, 2023 Final design reflecting feedback to be completed by July 24, 2023 Please contact Program Manager, Sandi Millett Campbell, at cao@annapolisroyal.com or 902-532-2043 x104. Construction to be completed by November 30, 2023 The method of Contractor Selection has not been Determined at this time.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.