Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 5, 2023

August 21, 2023

October 31, 2026

To Be Determined

Site Work

No Information to Display

$100,000,000.00

Public - Federal

img_map_placeholder

To Be Determined, Whidbey Island Naval Air, WA

Subscribe to View Full Documents

THIS PROJECT CONSISTS OF DRAWINGS SHOWING REPLACEMENT OF SELECTED DETERIORATED AIRFIELD PAVEMENT ALONG TAXIWAY ECHO AND THE RUNWAY 25 THRESHOLD, INCLUDING CONSTRUCTION OF NEW APRON PAVEMENT ADJACENT TO TAXIWAY CHARLIE WITHIN THE TRANSIENT RAMP, ALL LOCATED WITHIN THE NAVAL AIR STATION WHIDBEY APPROXIMATELY 390,585 SQUARE-FEET OF EXISTING CONCRETE TAXIWAY PAVEMENT AND ASPHALT CONCRETE SHOULDER PAVEMENT WILL BE REMOVED AND REPLACED ALONG TAXIWAY ECHO, AND NORTH APRON, REPLACE PAVEMENT MARKINGS IN KIND APPROXIMATELY 258,943 SQUARE-FEET OF EXISTING CONCRETE RUNWAY PAVEMENT INCLUDING ASPHALT CONCRETE SHOULDER PAVEMENT WILL BE REMOVED AND REPLACED AT THE RUNWAY 25 THRESHOLD APPROXIMATELY 84,189 SQUARE-FEET OF NEW TAXILANE/APRON CONCRETE PAVEMENT INCLUDING ASPHALT CONCRETE SHOULDERS WILL BE CONSTRUCTED ADJACENT TO TAXIWAY CHARLIE AT THE TRANSIENT RAMP. NEW STORMWATER CONVEYANCE SYSTEMS WILL BE INSTALLED AT THE INFILL AREAS TO CONVEY RUNOFF TO OIL WATER SEPARATOR (OWS) #8, WITH RESIZING/REHABILITATION OF EXISTING DOWNSTREAM STORMWATER CONVEYANCE PIPES AT TAXIWAY JULIET, WITHIN THE NORTH RAMP, AND BEFORE OWS #8. NEW EDGE LIGHTING FIXTURES AND OTHER SUPPORTING ELECTRICAL INFRASTRUCTURE WILL BE INSTALLED AT THE INFILL AREAS TO SUPPORT THE EXTENDED PERIMETER

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.