Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 26, 2023
November 27, 2023
October 16, 2024
To Be Determined
Paving, Renovation, Site Work
No Information to Display
$2,000,000.00
Public - Federal
To Be Determined, Luna, NM
Bid is cancelled Cancellation Description In accordance with Federal Acquisition Regulation (FAR) subpart 14.209, Cancellation of invitations before opening., the following for cancellation of the Invitation for Bid (IFB) as per FAR 14.209 (a) . This project is located in the Gila National Forest in western-central New Mexico. This project consists of replacing an existing bridge structure on Forest Route 220 (MP 7.325) over Romero Creek in Catron County, New Mexico.The existing single-span bridge's overall length is 30.4-ft and width (out-out) measures 16.0-ft.The existing roadway width is 14.0-ft. The solicitation was posted on the System of Awards Management (sam.gov) on September 22, 2023, under 6982AF23B000035. The bid opening date was set for October 26, 2023. No bids have been received to date. Due to the funding of this project being charged back by the Forest Service, this solicitation is being cancelled.Cancellation of the Invitation for Bid is in the public interest because the timing of funding for the project is currently unknown. The current plan is to resolicit in late 2023 or early 2024. Contractors will be notified via sam.gov. The authority for the of cancellation of Invitation for Bids, identified in FAR 14.209, rests with the Contracting Officer. This project is in the Gila National Forest in western-central New Mexico. The terrain is rolling and mountainous with elevations ranging up to 8300 ft. The Romero Creek Bridge deck has large areas (approximately 60%) of delamination that are deep (2" to 10"). The most recent bridge results indicate the structural evaluation of the bridge to be in poor to serious condition. Proposal would replace this bridge with a similar structure, add bridge rail/guardrail and pave the approaches 100' on each side of the bridge to keep rocks/debris/soil off the deck and to prevent sediment from entering the stream. NFSR 220 will be a main haul route for an upcoming restoration project within the next few years. There is potential for thousands of loads of timber to come out on NFSR 220. OF THE WORK: This project consists of replacing an existing bridge structure on Forest Route 220 (MP 7.325) over Romero Creek in Catron County, New Mexico. The existing -span bridge's overall length is 30.4-ft and width (out-out) measures 16.0-ft. The existing roadway width is 14.0-ft. PRINCIPAL WORK ITEMS: Approximate quantities for major work items: 1 (LPSM) of Removal of Existing Structures and Obstructions 250 CUYD of Embankment Construction 250 TON of Roadway Aggregate 100 TON of Asphalt Pavement 14-ft x 48-ft of Prefabricated Steel Bridge 50 CUYD of Structural Concrete 200 LNFT of Guardrail, including terminals 100 hours of Equipment Hours 120 hours of Labor Hours ANTICIPATED SCHEDULE: Advertise: September 2023 : November 2023 Construction: January 2024 - October 2024 ESTIMATED COST RANGE: The anticipated cost range is between $700,000 and $2,000,000. MISCELLANEOUS: ADDITIONAL INFORMATION FOR NOTICE: The work will be listed within a Schedule (Schedule A) and no options are proposed. Adjacent segments of Forest Route 220 will remain closed during construction and can be used for contractor staging and storage. Access is to both sides of the bridge is possible by detour. Shallow foundations are anticipated Anticipated Notice to Proceed in January, with ground disturbing activities starting in April.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Las Vegas, NM
Bid Date: Oct 25 2023
Las Cruces, NM
Bid Date: Oct 31 2023
Albuquerque, NM
--
Carlsbad, NM
Bid Date: Oct 30 2023
Carlsbad, NM
Bid Date: Nov 01 2023
Albuquerque, NM
Bid Date: Nov 15 2023
Los Alamos, NM
Bid Date: Nov 14 2023
Las Cruces, NM
Bid Date: Nov 02 2023
Albuquerque, NM
Bid Date: Oct 18 2023
Albuquerque, NM
Bid Date: Sep 06 2023
Albuquerque, NM
Bid Date: Aug 31 2023
Gallup, NM
Bid Date: Aug 28 2024
Malaga, NM
--
Roswell, NM
Bid Date: Sep 12 2023
Santa Ana Pueblo, NM
Bid Date: Oct 28 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
