Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 30, 2023

August 29, 2023

August 28, 2025

To Be Determined

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

To Be Determined, Detroit, MI

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Reference Number 0000321814 Bid Intent Not Available Question Acceptance Deadline 06/16/2023 02:00 PM EDT Questions are submitted online Yes The work consists of replacing approximately 24,556 linear feet of existing six, eight, and twelve-inch water main including Gate Valves, Fire Hydrants, and approximately 14,117 linear feet of existing lead services, and all appurtenances required to complete the work. The Contractor shall only be allowed to operate line valves up to and including sixteen inches in size under DWSD direct supervision. The Bidder hereby agrees to perform all work assigned by the Engineer no matter where located and at the Unit Prices established in the Bid Schedule. The work also consists of Lead Service Line Replacement, both in the ROW and from curb box to the property water meter and will include the coordination between the Contractor and the DWSD Lead Service Line Team. Bidder to coordinate with Lead Service Line Team for interaction and communication with residents, delivery of notices, pitchers and filters to residents, and all other requirements as found in the specifications for Lead Service Line Replacement. The Bidder agrees that any work including unmarked underground utilities that may be required to complete any specific item shall be considered incidental and no claim for additional compensation will be made. The contractor will be responsible for following DWSDs Full Lead Service Line Replacement (FLSLR) Standard Operating Procedures (SOPs) and specification to remove full LSLs efficiently, effectively, and safely. All Work shall be performed to the standards and requirements of the local jurisdiction or permitting agency with authority in the right of way where the Work is performed. Any Work performed within the Detroit DPW, Wayne County, or MDOT road jurisdictions shall be in accordance with the requirements of the Detroit DPW, Wayne County, and MDOT authorities respectively. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % - Warranty Bond 10 % General Requirements - Bid Deposit Required - FOB Destination - Insurance Required - Safety Standards Plan Contact Information Ali Bdair 313-880-2815 ali.bdair@detroitmi.gov

57 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.