Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 4, 2023

October 1, 2023

April 30, 2025

957 E Foster Wells Rd

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

957 E Foster Wells Rd, Pasco, WA

Subscribe to View Full Documents

This project includes clearing and grubbing of approximately 202 acres; cut and haul of approximately 1.3 million cubic yards of soil; construction of three lagoons totaling 329 million gallons of storage; installation of approximately 5,000 linear feet of embankment drains; installation of approximately 5,500 linear feet of deep excavation, 42 to 48-inch-diameter FRP gravity process water main around the perimeter of the PWRF site; installation of approximately 4,500 linear feet of 30-inch-diameter high density polyethylene (HDPE) gravity main; approximately 5,350 LF of 12-inch-diamter HDPE process water force main; approximately 1,700 LF of 10-inch-diamter HDPE process water force main; installation of approximately 7,200 LF of 8-inch-diameter HDPE force main within the proposed lagoon embankments; modifications to an existing irrigation pump station wet well; construction of concrete process water conveyance structures; process water appurtenances including flow meters, valves and slide gates; approximately 16,000 LF of power and fiber optic conduit; importing of approximately 45,000 cubic yards of various fill material; and other work, all in accordance with the Contract Plans, Special Provisions, and the Standard Specifications. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This contract contains intermediate milestones and three-hundred and seventy-five (375) working days to physically complete the work. Para más información o para solicitar un intérprete, favor de comunicarse con Janette Romero al 509-543-5738 o romeroj1@pasco-wa.gov Technical questions regarding the scope of this project should be put in writing up until three working days prior to bid opening and directed to Teresa Reed-Jennings, PE - Senior Engineer, City of Pasco, Public Works, 525 N. 3rd Avenue, PO Box 293, Pasco, WA 99301, Email: reed-jenningst@pasco-wa.gov.

42 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.