Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 13, 2023

December 12, 2023

July 7, 2026

US-60

Demolition, New Construction, Paving, Site Work

No Information to Display

$64,610,000.00

Public - State/Provincial

img_map_placeholder

US-60, Gold Canyon, AZ

Subscribe to View Full Documents

The proposed work is located in Pinal County, on US 60 between mileposts 227.51 and 229.57, just east of the Town of Superior. The work consists of removing existing bridge and constructing a new four span steel girder bridge on a new alignment. The work also includes reconstructing roadway approaches, constructing retaining walls, rehabilitating a tunnel, replacing guardrail, and other related work. AZDOT - System Preservation (Bridge Replacement) The amount programmed for this contract is $64,610,000 060 PN 227 H856601C 060-D(216)S & 060 PN 229 F031501C 060-D(221)T

45 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.