Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 26, 2024

February 26, 2024

December 31, 2024

1221 O'Keeffe Ave

New Construction, Site Work

No Information to Display

$400,000.00

Public - City

img_map_placeholder

1221 O'Keeffe Ave, Sun Prairie, WI

Subscribe to View Full Documents

From the information provided by the client, it is understood that the proposed development will consist of a new restroom building, pavilion, concrete pavement, asphalt trail, and utilities. The pavilion and restroom are estimated to be supported by frost depth spread footings. Proposed pavements will be flexible asphalt and rigid concrete. Primarily, pavements will be used for pedestrian traffic and will be used for occasional maintenance truck traffic. Traffic loading details were not provided. Proposed utilities include a new gravity 8-inch diameter sanitary sewer and a new 8 or 12-inch diameter watermain. Utility bearing depths were not provided but are estimated to be less than 15 feet below existing grades. Structural loads were not provided but are estimated to be light to moderate in magnitude. It is understood that the finished floor elevation of the new restroom will be about EL 947 and the finished floor of the new pavilion will be about EL 940. The invert elevations of utilities were not provided by the client. Elevations at the borings located within the proposed pavilion and restroom ranged from about EL.941 to EL. 947. Based upon elevations in the area of the proposed pavilion (EL. 941) and restroom (EL. 947), cuts of about 2 feet and fills of about 2 feet are estimated to be required to establish the floor slab elevation, respectively. However, this will also be dependent on the subgrade preparation criteria, to be discussed in a later section of this report Questions received less than ten days prior to the date for opening of Bids may not be answered.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects