Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 16, 2023

July 17, 2023

August 21, 2023

Multiple Locations

Renovation

No Information to Display

$48,820.00

Public - City

img_map_placeholder

Multiple Locations, Bedford, NH

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Work of the Project includes the upgrade/ installation of overhead paging systems in each building. In order to provide this service, the RFP will require the following: a. The paging system must allow the building to page all rooms, specific zones, and individual rooms. b. Each classroom including the multipurpose room should be considered a single paging location/ zone. c. Hallway speakers should be considered a single paging location/ zone. d. The office areas should be considered a single paging location/ zone. e. The system will interface with the existing NEC SV8100 telephone system. f. End users must be able to dial a specific number that interfaces into the paging system so that they are allowed to page from any phone in the building. g. Vendors may recommend additional speaker or horn locations. h. Vendor is responsible for disposal of old equipment. i. The system must be able to provide bell schedules or alerts to notify students of class changes. j. The paging system programming interface, administration, software and documentation will be provided to the District. k. The paging system administrative login information required for programming will be provided to the District. l. PoE+ switches, if proposed, must be compatible with HP ProCurve (Aruba) 5400R ZL2 equipment. m. Contractor to tie-in to available MDF and IDF closets; a map of closets is provided in Appendix D. 1. Location a. Peter Woodbury Elementary School - 180 County Road b. Memorial Elementary School - 55 Old Bedford Road Work to be completed by August 21, 2023. Bids will be publicly opened at the Office of the Superintendent, SAU25, located at 103 County Road, Bedford, NH

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.