Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 1, 2023

October 2, 2023

No Information to Display

101 Bridge St

Renovation

No Information to Display

$235,643.00

Public - County

img_map_placeholder

101 Bridge St, Labelle, FL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

As of October 23,2023, this project has not yet been awarded. A timeline for award has not yet been established. Repair and replace damaged sections of jail from water The County retains the right to cancel this solicitation or reject any or all responses for any reason set forth in the Countys Procurement Policy and may choose to re-procure at the discretion of the Board of County Commissioners. Hendry County is an Equal Opportunity Provider and Employer. Any questions are to be directed first to: Admin Assistant, Regina Singer at regina.singer@hendryfla.net, 640 S. Main St., LaBelle, FL 33935 ) Clean the concrete floor and remove and replace the water damaged affected plywood. FIRST FLOOR 1) Remove and replace commercial grade tile floor coverings with crack suppressant underlayment base. Remove and replace areas of affected ceilings and light fixtures. Paint hallways, kitchen, storage hall, and storage room. 2) In men's hallway restroom remove and replace the ceiling tiles and paint. 3) In women's hallway restroom remove and replace the ceiling tiles, dry-wall tiles, vanity, and paint. 4) In Sheriff's Secretary office replace the baseboards, tile floor coverings with crack suppressant underlayment. Replace areas of water damage affected ceiling tiles and paint. 5) In Sheriff's office replace carpet, baseboards, and paint. 6) In Sheriff's bathroom remove and replace vanity. 7) In main IT's (Information Technology) room detach and reset the floating floor, clean and paint the area below the floating floor. 8) In the conference room remove and replace commercial grade laminate flooring, remove and replace water damaged affected areas of the drywall ceiling, baseboards, and paint. 9) In the Evidence room scrape the water damaged areas of the wall/ceiling and paint. 10) In the Accounts Payable Office paint the ceiling. 11) In Finance office, Captain's office and Records office scrape the water damaged areas of the walls/ceiling and paint. 12) In the Lobby remove and replace water damaged areas. Scrape the walls and ceilings that were affected and paint. 13) In Lobby Restrooms remove and replace the drywall ceiling and paint

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects