Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 22, 2023

July 24, 2023

August 31, 2023

2787 Airport Dr

Paving, Renovation, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

2787 Airport Dr, Grand Forks, ND

Subscribe to View Full Documents

Sealed bids, subject to conditions contained herein, for Construction for the UND Airport Apron Project. Proposal Forms. Responses may only be submitted on the UND's Jaggaer portal, all other forms of submreturned to the bidder. Bidders shall submit their proposal upon the forms contained in the Contract Dorequired to be turned in with the bid proposal: 1. Bid proposal form in its entirety. 2. Bid Bond form. 3. North Dakota Contractor's License The bid submittal requires three clearly marked responses in Jaggaer, a Company's Names Contractors Land a Company's Name Bid Form. Each bid proposal shall be made out on the form contained in the prothe response. In the bid bond response, the bidder must include a bid bond executed by a corporation athe State of North Dakota in an amount not less than 5% of the bid amount. The bid security should be North Dakota and must not contain any conditions either in the body or as an endorsement thereon. ThUniversity of North Dakota as liquidated damages in the event the successful bidder fails or refuses to edays after the award of contract and the maintenance of said work, if required, pursuant to the provision documents. No bidder may withdraw this bid within sixty (60) days after the actual date of the opening thereof. The for each contract will be retained until the contract has been awarded and executed, but no longer thanBid. All Bidders shall hold a valid North Dakota Contractor's license of the proper class for the full amount ofLaw Sections 43-07-05 and 43-07-12 and shall enclose a copy of the license or Certificate of Renewal ofresponse. A Contractor shall be the holder of a license at least ten days prior to the date set for receivingNo bid will be read or considered which does not fully comply with the above requirements as to bond asubmitted must be resealed and returned to the bidder immediately. Bids shall be in accordance with and submitted on the Bid form supplied within the Bid Documents. Failuthe Bid. The Owner reserves the right to reject any and all bids and to waive any irregularities therein anbid is received. The decision to award is to the lowest responsible bidder who meet the requirements. Thresponsible bidder include, but is not limited to, bid amount and past performance of the bidder in regafor the owner by the bidder. Past performance includes but is not limited to workmanship, meeting estaof the bidder's key personnel. Post bid interviews will be conducted with the low bidder at the discretion of the owner to establish theinvited to interviews will be required to provide resumes of key personnel at that time and specify that tproject through completion. The successful Bidder will be required at the time the contract is executed to provide a certificate from aCommissioner showing that all taxes due and owing to the State of North Dakota have been paid, WorkCertificate, Certificate of Insurance to include North Dakota Stop Gap coverage, "Builder's Risk coveragePerformance and Payment Bond and Waiver of Subrogation. The work of this Project shall be phased out as defined in the Drawings and Project Manual. Occupancymaintained during construction. Question Deadline 06/15/2023 at 2:00 PM CT

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.