Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 25, 2023

September 25, 2023

July 29, 2024

Roseville Pkwy

New Construction, Paving, Site Work

No Information to Display

$21,286,287.00

Public - City

img_map_placeholder

Roseville Pkwy, Roseville, CA

Subscribe to View Full Documents

**As of August 21, 2023, project was awarded to DeSilva Gates Construction, LLC but awarded amount is not available.** The project consists of the construction of the Roseville Parkway Extension Project consisting of the following improvements: 1. Construction of a four lane concrete roadway, including sidewalk and class II bike lanes, between Washington Boulevard and Foothills Boulevard. 2. Construction of a new bridge over Industrial Avenue and Union Pacific railroad tracks. 3. Construction of a multi-use path and a connection between Roseville Parkway and Industrial Avenue. 4. Signal modifications at Foothills Boulevard/Roseville Parkway and Washington Boulevard/Roseville Parkway The work includes improvements including: clearing and grubbing, excavation, curb, gutter and sidewalk, retaining wall, grading, bridge construction, abutment construction, slope protection, roadway and sidewalk construction, utilities including sewer, storm drain, electrical, fiber optic, striping, and other minor improvements. For any inconsistencies in the Contract Documents, please refer to the "DISCREPANCIES AND OMISSIONS" section of the Special Provisions for the order of document precedence. Although a firm timeline for construction has not been determined, construction is not expected to commence prior to September 2023. Contract time of 220 Working Days includes plant establishment period. Final acceptance and project closeout will not be granted until completion of the plant establishment period. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com. Question Deadline 06/23/2023 at 5:00 PM PT All communications relative to this project shall be conducted through Jesse Khatkar via Public Purchase. Questions/inquiries will Not be accepted after that time and date. All communications relative to this project shall be conducted through Jesse Khatkar via Public Purchase. Questions/inquiries will Not be accepted after that time and date. Question Deadline 07/05/2023 at 5:00 PM PT

39 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.