Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 2, 2023

September 18, 2023

April 20, 2024

To Be Determined

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

To Be Determined, Ririe, ID

Subscribe to View Full Documents

This project is generally described as an irrigation canal piping project in which approximately 8,500 LF of 63-inch HDPE irrigation pipe will be installed. The project will also include two recharge ponds and service takeouts for irrigation and recharge water delivery. The pipeline will be constructed with trench excavation. The project includes pipeline trench excavation and backfill, excavation and grading of two (2) recharge ponds, bore and jacking for a road, road cutting and trenching a road, trench shoring, installation of fittings and valves, construction of five service takeouts, and construction of inlet and outlet structures for the pipeline. The owner will supply the pipe materials, fittings, and gates. Other work items include traffic control, road surface repair, fencing, grading, and other related site work as described in the Contract. The last day to submit questions on the Bid Package will be Friday, July 7th, 2023 by 5:00 PM. A final addendum will be provided no later than Wednesday, July 12th, 2023 by 5:00 PM. If you have any questions, please email Hattie Zobott (hzobott@ardurra.com). The Work will be substantially completed on or before December 31st, 2023, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before April 20th, 2024. Enterprize Canal Company reserves the right to reject any or all proposals, waive, any nonmaterial irregularities in the bids received, and to accept the proposal deemed most advantageous to the best interest of the Enterprize Canal Company.

24 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.