Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

September 25, 2024

No Information to Display

FL-66

Site Work

No Information to Display

$12,055,948.00

Public - State/Provincial

img_map_placeholder

FL-66, Zolfo Springs, FL

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

District : 01 Selection Method : Low Bid Financial Management Numbers : 44622915201 Project Description : Sr 66 From Sr 35 (Us 17) to Charlie Creek The Florida Department of Transportation is working to issue a Request for Proposal (RFP) to solicit competitive bids and proposals from Proposers for the resurfacing and reconstruction of SR 66 from SR 35 (US 17) to Charlie Creek in Hardee County, a distance of 7.814 miles. The existing roadway is a 2-lane undivided facility. The Context Classification for MP 0.147 (Magnolia St.) to MP 0.594 (School House Road) is C2T; improvements include addition of Type F curb and gutter; mainline, sidewalk, driveway, and side street reconstruction; updated pedestrian features; and superelevation correction. The Context Classification for MP 0.594 to MP 7.814 is C2; improvements include milling and resurfacing with cross slope correction, radial widening, driveway reconstruction, and guardrail replacement. Advertisement Date 7/25/2023 Pre-Proposal Meeting Date/Time 7/31/2023 06:30 pm LBDB Qualification Validation Form Due Date 9/24/2023 07:30 pm Tech Proposal Due Date/Time 9/25/2023 07:30 pm Bid Price Due Date/Time 9/25/2023 07:30 pm Bid Opening Date/Time 9/25/2023 08:30 pm Technical Review Committee Meeting 1 Date/Time 9/28/2023 07:30 pm Final Selection Date/Time 10/03/2023 07:00 pm The method of contractor selection has not been determined at this time. FL DOT - RFP Engineering - Sr 66 From Sr 35 (Us 17) to Charlie Creek

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects