Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 3, 2023

July 11, 2023

September 26, 2023

To Be Determined

Renovation

No Information to Display

$39,685.00

Public - Federal

img_map_placeholder

To Be Determined, Mount Vernon, WA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

As of 8/17/23, per Owner, project is to rebid at a future time. Removal, collection and disposal of existing epoxy coating on entire platform surface. Removal of epoxy by Sandblasting, grinding or other approved method Expose, repair concrete surface, grind, and or seal cracks or imperfections as practical to provide ADA compliant walking surface Preparation of concrete platform surface for Application of concrete sealant and/or anti- slip epoxy coating Application of concrete sealant and/or anti- slip epoxy coating Application of required safety striping and stencils Estimated Schedule start Date: 6-15-23 - End Date 8/31/2023

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects