Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 20, 2023

July 20, 2023

November 30, 2023

W 123rd St

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

W 123rd St, Palos Heights, IL

Subscribe to View Full Documents

Removal of the existing double-barreled 96" CMP culvert and replacement of the same size doublebarreled 96" RCP culvert within the Navajo Creek on 123rd Street at the indicated locations on the construction plans. Work also includes the construction of sidewalks, handrails, and concrete pavement. The proposed construction shall also include construction activities within the stream; therefore, creek diversion, dewatering, erosion, and sediment control measures will be required during the construction period.

26 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.