Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 21, 2023

July 21, 2023

No Information to Display

925 Farm District Rd

Renovation

No Information to Display

$900,000.00

Public - City

img_map_placeholder

925 Farm District Rd, Fernley, NV

Subscribe to View Full Documents

Scope of work: Cotonwood Elementary School, Silver Stage Elementary - Silver Stage Middle Dining Hall 1. Tear off existing roof; haul off roofing debris. 2. Install (new) 30# felt or synthetic equal. New High Temp. Ice & Water at all perimeters. 3. Provide new drip edges at all sides of the various roofs. 4. Install new modified 40 year shingles per the specification. 5. New plumbing flashings, penetrations, curbs and any heating flashing up to 8 in diameter. 6. Reuse all mechanical curbs and exhaust vents. 7. Paint all metal flanges & metal flashing, etc. to match the (N) shingle color. 8. Malarkeys Vista AR (252) 130 mph lifetime shingles or equal. 9. New low profile modified ridge shingles at all ridges. Lyon County School District Roofing Project Cottonwood Elementary School, Silver Stage Elementary Silver Stage Middle Dining Hall . construct a project identified as LCSD Roofing Project Cottonwood Elementary, Silver Stage Elementary Silver Stage Middle Dining Hall Roof Replacement Project PWP-LY-2023-397 A general description of the project is as follows: Cottonwood Elementary, Silver Stage Elementary Silver Stage Middle Dining Hall Roofing Project: These projects consist of tearing off the existing roofs; haul off roofing debris and install 30# felt or synthetic equal and then cover all roofs with new Vista AR (252) modified asphalt shingles. General Contractors interested in submitting a bid must meet the requirements of NRS 338 as it relates to eligibility, which includes, but is not limited to, the following requirements: be licensed as a contractor with appropriate license limit and class; be qualified to bid public works projects (as qualified by the State of Nevada Public Works Division)

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.