Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 12, 2023

August 11, 2023

No Information to Display

Multiple Locations

Demolition, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Norwood, MA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Demolition of a single family residential building and a two family residential building All questions and requests for clarification or interpretation of the meaning of the IFB shall be in writing, addressed to jadams@norwoodma.gov by Thursday, July 6, 2022 at 12pm. The Town of Norwood is seeking sealed bids for demolition of two residential houses. A two-story multifamily house located at 1271 Washington St. Norwood, MA 02062 and a one-story single family house 1293 Washington St., Norwood, MA 02062. The houses are both wooden construction. The buildings are considered structurally safe. The Work to be performed under this contract shall, in general, consist of the following: Demolition, removal, and disposal of all construction both above and below grade. The Town has identified asbestos containing areas and abatement will take place on June 30, 2023. Maintain the site and surrounding areas, including public street and sidewalks, in a secure and safe condition at all times. Disconnecting, sealing/capping in place site utilities that cannot be removed. Removal of all debris and debris piles located around the property. Filling voids, grading and finishing the site with application of a minimum 12 inches of processed gravel.

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.