Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 18, 2023

December 18, 2023

May 6, 2024

299 Old Canyon Rd

Outdoor Lighting, Paving, Site Work

No Information to Display

$1,950,288.00

Public - City

img_map_placeholder

299 Old Canyon Rd, Fremont, CA

Subscribe to View Full Documents

Project Information : The Project is located at North East corner of Niles Canyon Road and Mission Blvd., Fremont, CA, 94536, and is described as follows: The project consists of tree protection and removal, partial demolition and removal of driveway and parking lot asphalt paving, clear and grubbing existing vegetated areas, rough and finish grading, construction of four new pickleball courts with acrylic sport court surfacing on asphalt base, installation of sport court lighting, including new PG&E transformer, switchgear, and electrical conduit, cables and pullboxes; application of slurry seal to existing driveway asphalt paving, installation of chain link fencing, concrete precast split rail fencing, site and pickleball court furnishings. The Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier's or certified check made payable to City, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond form included with the Contract Documents. The bid security must guarantee that, upon award of the bid, the successful bidder will execute the Contract and submit the payment and performance bonds, the insurance certificates, and the other documentation required by the Contract Documents, within ten days after City's issuance of the Notice of Award. The successful bidder will be required to provide performance and payment bonds, each for 100% of the Contract Price. License. This Project requires a valid California contractor's license for the following classification(s): Class A. Contractors bidding as a joint venture must secure a joint venture license prior to award of the Contract for the Project. Time for Completion. The planned timeframe for commencement and completion of construction of the Project is: One Hundred (100) working days. Estimated Project Cost. The estimated construction cost, or construction cost range, for the Project is $1,895,200.

39 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.