Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 13, 2023

July 13, 2023

August 12, 2023

Multiple Locations

Renovation

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Multiple Locations, Sydney, NS

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Supply and Install Gutters and Down Spouts to Multiple Family Housing Units Located on MacDonald Crescent & Gatacre Street, Sydney, N.S. 1 Contractor shall arrange an on-site meeting with gutter installer and Project Manager to review scope of work. Project Manager shall complete inspection during the initial installation of new gutter and guard. 2 When accepted, mock-up will demonstrate minimum standard of quality required for this work. Mock-up shall include a 4 foot length of bent gutter, one downspout with 3 foot hinged extension and precast splash pad. 3 Contractor shall be responsible to coordinate work with Project Manager Removal and Preparation 1 Remove existing Gutters and Accessories; 2 Prepare surface for new installation. 3 Seal any penetrations in existing fascia with clear or white exterior grade sealant. Tremco Dymonic, or approved equal Installation 1. All downspouts shall be fastened to structure with gutter straps. Straps shall be fastened to solid structure using zinc, powder coated screws. Length of screws to be sufficient to penetrate min. 3A" into solid structure. 2. All gutter components shall be fastened together using zinc, self-piercing, powder coated screws. 3. All downpipe connections are to be fastened together with a minimum of three pan head stainless steel screws. This may be in the form of a Performance Bond and a Labour and Material Bond each in the amount of 50% of the contract. Alternate acceptable security includes a minimum of 10% of the Contract amount in the form of a Certified Cheque. Estimated Duration of Contract (months) : 1 The Contractor shall comply with all Federal, Provincial or Municipal laws and regulations, relating to the work and shall pay for all permits, licenses, fees and certificates required for the execution of the work. The right to reject any or all Bids or to accept any Bid deemed most satisfactory is reserved by the Authority. The Authority reserves the right to waive any informality in any or all Bids.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.