Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 20, 2023

July 20, 2023

October 3, 2023

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Multiple Locations, Wasco, OR

Subscribe to View Full Documents

The Project consists of constructing approximately: 1,492 l.f. of 4", 6" and 8" ductile iron waterline; 896 l.f. of 4" PVC waterline; 4 valves; 1 hydrant; an 8" hot tap, 2" water service and a connection; along with all restoration and appurtenances necessary to provide a complete and functioning project. The Engineers' Estimate for the Project is between $250,000 and $350,000. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis as indicated in the Bid Form Upon Issuing Office's receipt of payment, printed Bidding Documents will be reproduced within 24 hours and sent via the prospective Bidder's delivery method of choice; the shipping charge will depend on the shipping method chosen. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidder's date of receipt of the Bidding Documents. Partial sets of the Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office . A pre-bid conference will not be held. Bid security shall be furnished in accordance with the Instructions to Bidders. The Owner may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Owner it is in the public interest to do so. The Owner also reserves the right to waive any informality in connection with said bid or to postpone the award of the Contract(s) for sixty days. Each bid must contain a statement as to whether the Bidder is a resident bidder as defined by ORS 279A.120. Award of the Project will be contingent upon funding The Notice of Intent to Award shall be issued via facsimile or electronic data exchange to all bidders - the Owner may choose to waive the 7-day Bid Protest period Attention is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the Contract(s). This public works project is subject to the Oregon Prevailing Wage Rate laws. No bid will be received or considered by the Owner unless the bid contains a statement by the Bidder as part of their bid that provisions of ORS 279C.800 through .870 (Oregon Prevailing Wage Law) will be complied with and the Bidder is registered with the Construction Contractors Board as required by ORS 701. This Project does not involve asbestos removal. Bidding Documents may be viewed and ordered online by registering with the Issuing Office at: Kristil Bish at kbish@tennesoneng.com. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This project is located in Wasco County (Region 9) All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than five (5) business days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. 7.02 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.