Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 13, 2023

September 11, 2023

May 31, 2025

To Be Determined

Remodeling, Site Work

No Information to Display

$5,060,000.00

Public - City

img_map_placeholder

To Be Determined, Treynor, IA

Subscribe to View Full Documents

Wastewater treatment facility improvements that include remodeling and expanding the existing blower building, new aeration blowers, desludging of the existing lagoon cells and land application of the removed sludge, modification of the existing lagoon cells to convert them to covered lagoon cells with new aeration equipment, construction of a new three train polishing reactor structure, construction of an ultraviolet disinfection system, construction of a standby generator and automatic transfer switch, site grading, and construction of various site piping, manholes, and appurtenances. Est. Value: $ 6,380,000.00 Each bidder shall accompany its bid with bid security as defined in Iowa Code Chapter 26, Section 26.8, and as specified by the City of Treynor, in the amount of 5% of the bid, as fixed in the Instructions to Bidders. The work shall commence on the day indicated in the Notice to Proceed and shall be substantially complete on or before December 31, 2024 and completed and ready for final payment on or before May 31, 2025. Should the Contractor fail to complete the work in this timeframe, liquidated damages of $750.00 per calendar day for substantial completion and $500.00 per calendar day for final completion will be assessed for work not completed within the designated contract terms.

70 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.