Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 28, 2023

August 28, 2023

July 31, 2025

Multiple Locations

Demolition, New Construction, Paving, Site Work

No Information to Display

$1,805,784.00

Public - City

img_map_placeholder

Multiple Locations, Carsonville, MI

Subscribe to View Full Documents

**As of August 17, 2023, this project has not yet been awarded. Award is anticipated the end of the month or the beginning of next month to Phoenix.** Cont 1: new Water Storage Tower, foundation, demo of ex. tower, storm sewer, HMA work Cont 2: 750' of 8" raw water main from new well house to ex. WWTP Cont 3: install 256 water meters Cont 4: abandon two wells, const two Type 1 water supply wells and wellhouse, ex. WWTP imps Contract 1 - Elevated Water Tower: The work includes construction of a new 100,000 Gallon Water Storage Tower, new foundation, demolition of the existing 100,000-gallon water storage tower, storm sewer, site work and HMA work with other appurtenances. Contract 2 - New Raw Water Main: The work includes approximately 750' of 8" raw water main directional drilled and open cut from a new well house to existing water treatment plant. Project also includes new curb and gutter replacement, sidewalk replacement, and lawn restoration and other appurtenances. Contract 3 - Water Meter Replacements: The work includes providing and installing 256 water meters in the sizes specified while coordinating all work with the Village and Village Customers. Contract 4 - Water Supply: The project includes abandonment of two wells, construction of two Type 1 water supply wells and a wellhouse, and improvements to the existing water treatment plant including chemical feed system, SCADA system, and electrical and control improvements. This DWSRF 7687-01 Water System Upgrades project is comprised of four contracts that will be bid separately: Contract 1 - Elevated Water Tower Contract 2 - New Raw Water Main Contract 3 - Water Meter Replacements Contract 4 - Water Supply WAGES: This project is subject to prevailing wages. Bid Result. Contract 1: Phoenix Fabricators $1,805,784.00 Contract 3: Michigan Pipe $499,949.00

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.