Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 9, 2023

July 10, 2023

October 8, 2023

Multiple Locations

Renovation

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Buffalo, NY

Subscribe to View Full Documents

Campus Gates - installation It is the intent of this project for awarded contractor to install gate's at various location's on campus.. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 90 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of gate install's, before removal of equipment, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent. Service-Disabled Veteran-Owned Set Aside: No Total MWBE Participation Goals: 20% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Vendor Questions due: June 6th COB Any questions not asked at the site visit must be submitted in writing to OPWDD.sm.wny.bo.procurement@opwdd.ny.gov within 2 business of the site visit. Contractor s will receive a response within 2 business days after the deadline for submitting questions. All questions and answers will be e-mailed to all contractors that attended the mandatory site visit. DESCRIPTION: It is the intent of this project for awarded contractor to install gate's at various location's on campus.. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 90 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of gate install's, before removal of equipment, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent. SCOPE OF WORK includes, but is not necessarily limited to the following: 1. All work to be completed as per provided specs. 2. All work to be done by winning bidder, no subcontracting on this project. GENERAL REQUIREMENTS: 1. Bid price is to include all materials, labor, disposal of materials fees and site clean-up. Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor. 2. Work is to be done between the hours of 7am__ and __5pm_, Monday through Friday. 3. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each work day. 4. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery. 5. Smoking is prohibited by contractors at all residential and program sites owned by OPWDD. 6. Prior to the commencement of the work, there shall be a meeting with DDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period. 7. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property. 8. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work. 1200 East & West Rd, West Seneca NY 14224

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.