Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 30, 2023

November 1, 2023

No Information to Display

To Be Determined

Addition, Demolition, Remodeling, Renovation, Site Work

No Information to Display

$500,000,000.00

Public - Federal

img_map_placeholder

To Be Determined, Camp Pendleton North, CA

Subscribe to View Full Documents

This project will provide design and construction to convert the existing electrical distribution from 4kV to 12kV at Marine Corps Base Camp Pendleton, CA. The existing 4kV system does not meet current codes and standards. In addition, the existing load exceeds the current capacity. Future growth in the area will make the system unreliable and substandard. The new 12kV distribution system shall be sized for a capacity of 6 MVA. Work shall include, but is not limited to: installation of overhead and underground copper conductors, installation of new poles, crossarms, insulators, fuse cutouts, pole and pad mounted transformers, duct banks, switches and other related incidental work. Refer to Part 6 for limits of work. The existing 4kV system shall remain active throughout the entire project construction. The new .12kV system shall be constructed in a way that allow the loads to transition from the existing 4kV to the new 12kV without any major interruptions in the electrical service. Once the new 12kV system has been constructed, interruptions during the cut-over period from the 4kV to the new12kV system shall be kept at a minimum. But not limited to please review the specifications for more information. Magnitude of Construction: $250M - $500M Prevailing Wages Apply. Contract duration = 730 calendar days

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects