Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 21, 2023

July 21, 2023

September 29, 2023

Multiple Locations

Site Work

No Information to Display

$704,770.00

Public - County

img_map_placeholder

Multiple Locations, Oroville, CA

Subscribe to View Full Documents

In general work consists of, selective demolition, excavation, backfill, seeding, installation of reinforced concrete pipe, flap gates, slide gates, reinforced concrete riser structures, and reinforced concrete inlet and outlet structures all in conformance with the California Department of Transportation 2018 Standard Specifications. All requests for information inquiries shall be submitted by 5:00 p.m. on Monday, June 12, 2023, through Public Purchase. The engineers estimate for this project is $808,000.00 All requests for information inquiries shall be submitted by 5:00 p.m. on Monday, June 12, 2023 through Public Purchase.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects