Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 8, 2023

January 1, 2024

June 30, 2025

4100 Treffert Dr

Renovation, Site Work

No Information to Display

$375,000.00

Public - State/Provincial

img_map_placeholder

4100 Treffert Dr, Oshkosh, WI

Subscribe to View Full Documents

State of Wisconsin, Department of Administration, Division of Facilities Development, hereinafter termed DFD. All potential bidders must be certified by DOA prior to submitting bids on state construction projects over $50,000. All bids received from contractors who are not certified will be rejected The bidder is responsible for the sealed bid being delivered to the indicated location or email before the time specified for the bid submission. Third party delivery is entirely at the bidders risk. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Base Bid will be received for: A single lump sum bid for All Work. Sealed bids will be received as follows, before the time indicated above: PDF scanned file of all required bid documents, including bid and bid bond forms with original wet signatures or properly transmitted electronic signatures (only PDF files will be accepted) emailed to doadfdmbidsubmission@wisconsin.gov (this is the preferred method); US Mail or Third-party delivery (UPS, Fedex, or DHL) to State of Wisconsin In general, the work consists of: removal of existing recirculation/reservoir pump and miscellaneous piping; installation of new vertical turbine pump and pump foundation; installation of hydropneumatic tanks; installation of process piping, fittings, check valves, air release valve, gate valves, flow meter, pressure transmitter, and pressure relief valve; installation of electrical controls and variable frequency drive (VFD); installation of communication system conduit; and installation of adjustable gantry crane and hoist. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsins prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements

21 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.