Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 22, 2023

July 1, 2023

September 30, 2023

Multiple Locations

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Weathersfield, VT

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

**Project awarded to Blaktop,Inc. The awarded amount is $102.77 per ton** All questions pertaining to this Request for Paving Bids shall be submitted in writing to Brandon Gulnick, Town Manager at the Weathersfield Town Office located at 5259 US Route 5, Ascutney, Vermont 05030 or e-mailed to townmanager@weathersfield.org The question period ends at 4:00PM, June 16, 2023. Questions received after this date and time will not be answered. This project is to shim all depths greater than 1/2 " than pave .31 miles of the project area with 1/2 " inch mix, 1.5"-inches depth (Sunset Boulevard, and Cherry Lane), and .11 miles of project area with 1/2 " inch mix, 2.0" inches depth (Thrasher Road) of Type III 75 Blow Marshall Bituminous Concrete Pavement Apply emulsion before paving. Pave driveway and side road aprons to 2' length. Cold planning beginning and end project tapers (10' length from butt joint), cold planning paved side road aprons. Backup drives, and mailbox pullouts with shoulder gravel (NOTE: include separate line for shoulder work.) Provide traffic control. Sunset Boulevard & Cherry Lane are full length paving projects and roads are connected; Thrasher Road is a 600' "patch/ repair."

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects