Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 8, 2023

July 10, 2023

No Information to Display

To Be Determined

Asbestos Abatement, Renovation

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

To Be Determined, Trenton, NJ

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The objective ofthis project is to evaluate, plan, design and execute the replacement of 27 AHU's and associated equipment within this fully operational office building. Include additional equipment, as needed, to address current humidity control issues. Also included is the design for removal of existing inoperable, abandoned or by-passed equipment and piping and the design and installation of a temporary or permanent opening to facilitate the project, along with removal ofequipment / piping that may impact access and staging. Existing condensate / floor drain failures are to be abated with all new drains and piping or a piping restoration solution beneath the penthouse. Sludge, scaling, and deteriorating issues within existing chilled water piping are to be evaluated and branch piping will be replaced with a value engineering solution for the mains. Hot water piping is to be evaluated and addressed, as needed. Duct lined insulation degradation is to be evaluated throughout the building and particulate and mold discharge will be abated with a permanent solution. Include replacement and energy control of 4 exhaust fans within the garage. Evaluate, recommend and provide design development level ofnew high temperature hot water mains extension in order to by-pass steam generating equipment (owned by Vicinity Energy) and provide necessary exchangers and/or associated equipment from garage entry P2 to mechanical room Pl level

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.