Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 27, 2023

July 27, 2023

August 25, 2023

22 Williamsville Rd

Paving, Site Work

No Information to Display

$84,000.00

Public - City

img_map_placeholder

22 Williamsville Rd, Killingly, CT

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Complete renovation (excavate, install new subgrade, compact and pave), including loam and seeding all edges of a 17,775 square foot parking lot Background Goodyear Early Childhood Center is home to 130 preschool students. The current parking lot for faculty and parents is in disrepair, creating unsafe conditions for our youngest learners, parents, and staff. B. Project Description Killingly Public Schools is seeking a contractor to provide a proposal to remove and dispose of existing asphalt of approximately 17,775 square feet. Excavate subgrade and supply and install finish grade and compact. Pave 1 layer of Class #1 binder compacted. Pave 1 layer of level #1 super pave compacted with below guidelines and conditions: a. Contractor to confirm square footage prior to proposal b. Removal of existing asphalt and disposal c. Excavate out 5 inches of sub grade d. Supply and install 4 inches of 1.25 inches finish grade and compact e. Pave 1 layer of Class #1 binder compacted to 2 inches f. Pave 1 layer of level #1 super pave compacted to 2 inches g. Loam and seed all edges h. Repainting of existing parking spaces and driveway markings i. All concrete curbing to stay in place and shed will stay and be paved around A mandatory pre-proposal walk-through is scheduled for June 6, 2023 at 9:00 a.m. at Goodyear Early Childhood Center 22 Williamsville Road, Rogers, Connecticut 06263. The project must be completed by August 25, 2023. Questions may be submitted by email until June 20, 2023. Questions may be submitted by email only to Mike Vassar mvassar@killinglyschools.org

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.