Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 17, 2023

September 14, 2023

February 9, 2024

To Be Determined

Renovation

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

To Be Determined, Moose, WY

Subscribe to View Full Documents

GRTE Moose-Wilson Road Granite Entry Station Vertical Construction PROJECT DESCRIPTION: Grand Teton National Park (GRTE), Moose-Wilson Road Granite Entry Station Vertical Construction, Granite Entrance Station work shall consist of vertical structures, mechanical systems, electrical systems, IT systems and some additional amenities as listed. Hereafter referred to as Phase IB Vertical Work. All new construction shall meet the Architectural Barriers Act Accessibility Standards. SITE VISIT: Refer to 52.236-27 SITE VISIT (CONSTRUCTION) ALTERNATE 1 (FEB 1995) - RSVP to the contracting officer molly_lynam@nps.gov 24 hours in advance to receive the most up-to-date location and travel information. SET-ASIDE TYPE: This procurement is being solicited as a total Small Business (SB) Program Set-Aside. NAICS CODE: 236220 - small business size standard of $45M. MAGNITUDE: In accordance with FAR 36.204, the project magnitude is estimated to be between $500,000 and $1,000,000. DURATION: The contract performance period is start within 10 days of the NTP and complete within 150 days. SYSTEM FOR AWARD MANAGEMENT (SAM): The successful offeror must be registered in SAM and have current online Representations and Certifications. Please access http://www.sam.gov to update your records prior to submitting final offer. INSTRUCTIONS FOR SUBMITTING OFFER: Refer to Section L and M. The contractor agrees that they will follow the specifications provided. Offer shall be submitted via email. A detailed breakdown of the offeror's proposal price (e.g., labor, materials, profit, overhead, and other pricing elements) may be requested by the Contracting Officer during the evaluation and pre-award process to support a fair market value award. The contractor is encouraged to be proactive and prepare details for submission when preparing lump sum offer information. QUESTIONS: Pre-proposal questions shall be submitted a minimum of 7 days prior to the due date and time for proposals. Submit questions only though email to the contracting officer at molly_lynam@nps.gov. When submitting questions, offerors should include as much context as possible to help the government understand Q&A implications such as: is an RFP extension necessary, does this impact pricing, will this Q&A impact subcontractor pricing, etc.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.