Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 15, 2023

July 31, 2023

June 14, 2024

Cloverleaf Rd & Colebrook Rd

Paving, Site Work

No Information to Display

$2,464,003.00

Public - State/Provincial

img_map_placeholder

Cloverleaf Rd & Colebrook Rd, West Donegal Township, PA

Subscribe to View Full Documents

This project consists of work on SR 4025-012, SR 0230-049, SR 4018-010, T-321 (Colebrook Road), and T-335 (Cloverleaf Road) including resurfacing the existing roadway using Superpave wearing and scratch courses, milling, base replacement, minor drainage improvements, curb installation, and guide rail replacement, along with other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 4025, SECTION 012, in LANCASTER COUNTY, MOUNT JOY & WEST DONEGAL TOWNSHIPS, on SR 4025 (Colebrook Road) from SR 4018 (Harrisburg Ave) to SR 4010 (Mount Pleasant Road) at Segment 0010 Offset 0000 to Segment 0050 Offset 2002, length 8,259.00 linear feet (1.56 mile), SR 0230 (Main St) from Segment 0150 Offset 0092 to Segment 0150 Offset 0842, length 548.00 feet (0.104 mile), SR 4018 (Harrisburg Ave) from Segment 0030 Offset 2908 to Segment 0040 Offset 0077, length 361.00 feet (0.068 mile), T-321 (Colebrook Road) from Station 287+50 to Station 289+21, length 71.00 feet (0.013 mile), and T-335 (Cloverleaf Road) from Station 372+85.69 to Station 374+50, length 64.31 feet (0.012 mile), for a total project length of 9,303.31 feet (1.762 miles). Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: Non - Federal (100% State) Structure Work: 0.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Resurfacing/overlays PennDOT - Cloverleaf Rd and Colebrook Rd Resurfacing *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

21 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects