Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 21, 2023

August 21, 2023

August 1, 2024

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Multiple Locations, Alberta Beach, AB

Subscribe to View Full Documents

APPROXIMATE QUANTITIES: Sewage Lagoon: -Silt Fence 780 m -Clearing 1.0 ha -Topsoil Stripping 3,200 m3 -Subsoil Stripping 6,400 m3 -Common Excavation 20,000 m3 -Imported Fill Placement 9,000 m3 -Imported Fine Gravel Placement 1,300 m3 -Cell Armouring 800 m2 -Geosynthetic Clay Liner 11,500 m2 -Geomembrane Liner 11,500 m2 -Geocomposite Gas Collection 230 m -Supply and Install Surfacing Gravel (50mm thick) for Access Road 500 m3 -Topsoil Placement (150mm thick) 6,200 m2 -Broadcast Seeding 1.0 ha -Chain Link Fence 700 m -Supply and Install Ground Monitoring Wells 5 each -Culverts – Supply and Install (500mm dia. CSP) 80 m -Flow Control Structure between Faculative & Storage Cells 1 lump sum -1800mm ID Wet Well / Pump Station 1 lump sum -Metal Fabrication 1 lump sum -Anchorage in Concrete 1 lump sum -Pump Station Access Hatch 1 each -Equipment General Requirement 1 lump sum -Submersible Pump (12 hp c/w/ Mfg. Control Panel S.S., Outdoor Rated, Padlockable, 2 Float Switches) 1 lump sum -Piping, Valves & Fittings 1 lump sum -Pressure and Leakage Testing 1 lump sum -Pipe Supports 1 lump sum -Electrical Ductwork, Trenching, Excavation and Restoration 1 lump sum -Electrical Power Distribution, Breakers, Hydrometering, Junction Boxes, Pump Control Panel & Ass., Instruments, Wiring and Conduit 1 lump sum -Grounding (To be Confirmed with Fortis) 1 lump sum -Electrical Installation Inside Wet Well (Pump, Motor, Instrumentation, etc.) 1 lump sum Effluent Discharge Pipeline: -Clearing 12.0 ha -Common Excavation 50,000 m3 -Supply and Install 150mm dia. HDPE DR11 Pipe from Lagoon to Outfall (HDD) 1,077 m -H.A.B. Pits – Excavate, Dewater, Backfill, Expose All Utilities for Work Pits 2 each -Supply and Install 150mm dia. HDPE DR11 Pipe from Lagoon to Outfall (Open Cut) 3.403 m -Trench Reinforcement 3,403 m -Steel Casing (GR359) for Horizontal Auger Boring through CNR Crossing 175 m -Air Release Valve & Chamber 5 each -Water Line Marker Signs 34 each -Care of Water 1 lump sum -Environmental Protection Works 1 lump sum -Permanent Erosion and Sediment Control 1 lump sum -Broadcast Seeding 7 ha Outfall Structure at McLeod River: -Structural Excavation 100 m3 -Excess Material Disposal 100 m3 -Clearing 0.1 ha -Backfill – Compacted Non-Granular (Clay Seal) 45 m3 -Heavy Rock Riprap – Class 1 30 m3 -Supply & Install Non-Woven Geotextile Filter Fabric (Layfield Type LP16 or Approved Equivalent) 100 m2 -Temporary/Construction Access Road 1 lump sum -Topsoil Placement 280 m2 -Broadcast Seeding 0.10 ha -Rolled Erosion Control Product – Type C 280 m2 -Erosion Control Barrier (Silt Fence) 100 m -Precast Concrete Impact Baffle Structure 1 lump sum TIMELINE: Tender from general contractors issued in spring 2023 was subsequently cancelled by the owner. Project may be published in the future, pending owner's decision to proceed. Coverage of this report is discontinued. *Budget is unreleased.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects