Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 15, 2023

July 17, 2023

No Information to Display

100 Olympic Dr

Renovation

No Information to Display

No Information to Display

Public - County

img_map_placeholder

100 Olympic Dr, Waynesboro, GA

Subscribe to View Full Documents

To request RFP package, please contact Teresa Moore, tam@jwbuckley.com. Additionally, any questions regarding the bid documents or the bid process should be directed to David Holton at djh@jwbuckley.com . Contract, if awarded, will be on lump sum basis. No bid may be withdrawn for a period of 35 days after time has been called on the date of opening. Bids must be accompanied by a bid bond and in an amount not less than 5% of the base bid. Both performance bond and a payment bond will be required in an amount equal to 100% of the contract price. The Owner reserves the right to reject any or all bids and to waive technicalities and informalities and to award the project on whatever basis is in the interest of the Owner. Envelope shall be marked 'SEALED BID - Blakeney ES HVAC" The Pre-bid conference is mandatory in order to submit a bid. Prospective Bidders not attending the Pre-Bid Conference will not be allowed to submit bids on the project. 1. DRAWINGS INDICATE SCOPE OF WORK - FINAL DETAILING WILL BE COORDINATED WITH PRIME CONTRACTOR. 2. ALL EXISTING WALL MOUNTED HVAC UNITS SHALL BE REMOVED. CONTRACTOR SHALL EXERCISE CAUTION NOT TO DAMAGE UNITS. OWNER WILL EVALUATE CONDITION OF UNITS TO DETERMINE WHICH ONES WILL BE SALVAGED. THE OWNER SHALL RETAIN UP TO 40 UNITS TO BE SALVAGED, OTHER UNITS TO BE DISPOSED OF BY THE CONTRACTOR IN A LEGAL MANNER Additionally, any questions regarding the bid documents or the bid process should be directed to David Holton at djh@jwbuckley.com 1. HVAC Replacement entire building. Requests for interpretation of drawings and specifications must be made in writing to the architect not later than five (5) days prior to the date set for receipt of the proposals Question Deadline 06/10/2023

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects