Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 7, 2023

September 2, 2024

October 15, 2025

Multiple Locations

Site Work

No Information to Display

$2,200,000.00

Public - County

img_map_placeholder

Multiple Locations, Fremont, CA

Subscribe to View Full Documents

Question Deadline 11/02/2023 All questions should be directed to the Contract Administration Office at (510) 670-5450. The County reserves the right to go to the Board of Supervisors for a determination that the Contractor is non-responsible and will be ineligible to compete on future County contracts for a stated period of time or until the Contractor can demonstrate to the satisfaction of the Director of Public Works that the violation has been corrected. The contractor for this project must possess a Class A or C-12 license at the time this contract is awarded and throughout the construction contract duration. Contractor must also be properly licensed at the time the bid is submitted, except as provided for in Section 7029.1 of the Business and Profession Code for joint ventures or by Section 20103.5 of the Public Contract Code for federally-funded projects. This project is subject to all Local, State, and Federal laws, rules and guidelines contained in the plans and specifications, including but not limited to payment of prevailing wages. These wage rates are available at the Alameda County Public Works Agency's office at 951 Turner Court, Room 300, Hayward, Alameda County. The work to be done consists, in general, of providing and implementing water pollution control plan and job site management; clearing and grubbing; tree removal; providing construction fencing; providing tree protection; removal and disposal of concrete outlet; providing trench and excavation protection; earthwork involving excavation, filling, compacting fill, off-haul of excess material; designing and implementing de-watering system and temporary channel bypass; modifying existing outfalls; furnishing, placing and compacting rock slope protection; furnishing, placing, and compacting vegetated soil lifts; furnishing and placing rock riffles and pools; installing chain-link fencing and gates; furnishing, placing and compacting Class 2 aggregate base; furnishing and planting trees and native vegetation; providing plant establishment and maintenance; furnishing and installing temporary irrigation; and all miscellaneous work necessary to complete said project Estimated Cost: $2,200,000. MBE = N/A WBE = N/A DBE = N/A

20 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects