Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 14, 2023

July 14, 2023

November 11, 2023

Commercial Ave

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Commercial Ave, Coos Bay, OR

Subscribe to View Full Documents

Sealed Bids for the City of Coos Bay Commercial Avenue (3rd to 4th) Sidewalk Improvements. The Project entails cold plane pavement removal, asphalt concrete pavement, full depth asphalt removal, sidewalk improvements, curb and gutter removal and replacement, remove existing trees, new tree wells with grates, remove and replace. 279C.800 to 279C.870 regarding prevailing wage rates. Owner reserves the right to reject any and all bids, and to waive any technicalities or informalities in connection with the bids. No Bidder may withdraw traffic loop detector, striping, ADA improvements, demolition work and other miscellaneous items. Bidders must qualify with Owner per ORS 279C.430 as specified in the Instructions to Bidders, at the time of bid submittal. The Contract is for public work and is subject to ORS their bid until thirty (30) days after the bid opening. 7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to Owner in writing. Interpretations or clarifications considered necessary by Engineer and Owner in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents through QuestCDN. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. 7.02 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents. 7.03 No addenda will be issued later than five (5) working days prior to the date for receipt of bids except an addendum, if necessary, postponing the date for receipt of bids or withdrawing the requests for bids. 7.04 Requests to clarify the source of materials, equipment suppliers, or any other such matter which does not modify, change, increase, or decrease the scope of work will be answered by Owner and Engineer up to the date of opening bids. No written responses will be made.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects