Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 20, 2023

January 17, 2024

No Information to Display

93 Main St

Paving, Site Work

No Information to Display

$1,020,577.00

Public - City

img_map_placeholder

93 Main St, Ellington, CT

Subscribe to View Full Documents

**As of July 17, 2023, The project will rebid. No definite date for the rebid.** As of June 22, 2023, this project has not yet been awarded. A timeline or award has not yet been established. The Town reserves the right to amend or terminate this invitation to bid, waive any informality, omission, or technical defect in the Bid Form, and to reject any or all proposals or to accept the proposal deemed most satisfactory to the Town of Ellington, if it is in the public interest to do so The anticipated construction start date is July 17, 2023. The project shall be substantially completed by October 15, 2023, and completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions on or before June 1, 2024. The work to be performed under this contract includes a parking lot expansion and new stenciled sidewalk at the Hall Memorial Library, 93 & 99 Main Street in Ellington. The scope of work includes reclamation and re-pavement of 2,575 square yards of existing bituminous parking lot, installation of approximately 2,700 square yards of new bituminous parking lot and 5,315 square feet of stenciled concrete sidewalk. The project consists of providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to completion of the work shown on the plans and described in the specifications including, but not necessarily limited to the following: tree and shrub removal, reclamation and re-use of existing bituminous pavement, demolition and disposal of existing curbing and concrete sidewalk, installation of storm drain structures and piping, installation of new bituminous parking lot, installation of pole mounted light fixtures, installation of new stenciled concrete sidewalk and curb ramps, installation of a segmental block sitting wall, landscaping and field verifying. Question Deadline 06/15/2023 All questions about the meaning or intent of the Bidding Documents are to be submitted to Finance Department in writing .

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects